
The building is intended to serve as a termination of the terminal at the south end of the airport constituting a “book end” with stronger vertical definition to contrast with the general horizontality of the terminal building. This project was completed in 2001 at a cost of R 25 million, and was done in association with Stauch Voster Architects.